Documentation and guides for the Novasense Portal, featuring configuration instructions for solar data sources including Huawei FusionSolar, SolarEdge, SMA, Fronius, Sungrow, and Solar-Log. Includes technical resources on performance analysis, KPI interpretation, and anomaly detection for PV systems.

Tokens
11K
Snippets
21
Records
83
Agent score
50%

What's inside Novasense

  1. Monitor thermal stress and inverter anomalies with Novasense

    Novasense provides real-time monitoring from the power plant level down to individual inverters and MPPTs to detect heat-related issues before they escalate. Key capabilities include:

    • Real-time detection of inverter and MPPT anomalies.
    • Visibility into temperature-related performance degradation.
    • Data-driven tools for Operations and Maintenance (O&M) and asset optimization.
  2. Quantify energy losses from active power control in Novasense Portal

    The Novasense Portal provides a 'Power Control' alarm category to quantify unused solar power caused by active power regulation. Novasense calculates theoretical inverter power using satellite-based weather data and compares it against control commands sent by the client in near real-time.

    Losses are determined based on these rules:

    1. The control command value must be lower than the theoretical power, and the actual inverter output must be close to the control command value.
    2. Inverters with outages occurring before a control command are excluded from loss calculations to ensure losses are explicitly attributed to power control.
    3. Durations shorter than 15 minutes are handled via an interpolation mechanism within 15-minute buckets.

    Quantified losses are available as time series in the portal and as aggregated total monthly energy losses in monthly reports.

  3. Analyze asset performance with the Novasense Portfolio Module

    The Portfolio Module allows users to compare and benchmark asset performance across an entire portfolio. It enables the analysis of key dimensions—specifically production, availability, and losses—to identify performance outliers and prioritize operational actions.
  4. Understand Boosterless Inverter functionality and trade-offs

    A boosterless inverter converts direct current (DC) to alternating current (AC) without an intermediate booster stage. Standard inverters use a booster (similar to a DC-to-DC transformer) to increase input DC voltage, allowing for a wider input range (e.g., 250 - 800 V). Boosterless inverters remove this stage to achieve higher efficiency and lower costs, but they offer reduced sizing flexibility because they require a higher minimum input voltage to function.
  5. Manage power plant tags and ownership

    The Tags feature allows for the organization and labeling of power plants. Tags are categorized into two types based on ownership:

    1. Tags Belonging to Your Organisation: Tags owned by your organization. You have full control to edit properties, share them with other companies, assign them to power plants, or delete them.
    2. Tags Shared With Your Organisation: Tags owned by other companies but shared with you. You can view and assign these to your power plants, but you cannot edit their properties or delete them.
  6. Generate performance reports with Automatic Reporting

    Use the Automatic Reporting tool to generate automated performance reports. This provides visibility into system health and production trends with minimal manual effort, aiding in the management of single sites or entire solar portfolios.
  7. Understand theoretical power modeling in Novasense Portal

    The Novasense Portal uses two primary approaches to calculate theoretical power (the calculated output of a solar plant based on weather and technical characteristics):

    1. A physics-based model (most widely used), which acts as a detailed simulation.
    2. A machine-learning model, which relies on the actual historical production of each inverter.
  8. Verify solar system configuration with Layout Check

    Use the Layout Check diagnostic tool to instantly verify a photovoltaic system's configuration. This tool identifies inconsistencies between the original design plans and the actual physical system setup to ensure the installation is not underperforming due to wiring, orientation, shading, or inverter misconfigurations.
  9. Optimize maintenance using the Operations Overview loss analysis

    The Operations Overview provides intelligent loss selection and categorization to help maintenance teams pinpoint the most impactful issues affecting energy and financial performance. This tool is designed to accelerate root-cause analysis and improve maintenance planning to increase asset availability.
  10. Size module strings for boosterless inverters to avoid summer energy losses

    To prevent energy losses, the Maximum Power Point (MPP) voltage of the module strings must remain higher than the inverter's minimum input voltage under the most unfavorable conditions (typically summer). Two primary factors must be accounted for during sizing:

    1. Grid Voltage Increase: High local PV production in summer can increase phase voltage (e.g., exceeding 240 V), which in turn increases the minimum DC voltage required by the inverter.
    2. Module Voltage Decrease: High cell temperatures (60-70°C) can cause the nominal voltage of solar modules to drop by approximately 15%.

    Sizing Recommendation: Do not rely solely on the nominal minimum input voltage in the datasheet. Include a margin to cover DC cable losses, long-term module degradation, mismatch, and local shading to ensure the MPP voltage never falls below the actual required input voltage.

  11. Migrate from Enerest 3 to Enerest 4 for Novasense onboarding

    Customers using the legacy Enerest 3 Portal must migrate to Enerest 4 before they can be onboarded into the Novasense Portal. Contact your local Solar-Log support for assistance with the migration process.
  12. Provide required documentation for plant onboarding

    To begin the onboarding process for a new plant in the Novasense Portal, the following documentation must be provided to Novasense to ensure metadata quality:

    • A completed Onboarding Form Template
    • String wiring plans
    • Inverter datasheets
    • Solar module datasheets
    • Information regarding the data sources used

    Accuracy in these documents is critical to avoid delays or additional effort in subsequent onboarding steps.