How check up importance and cure periods work
mainThe importance level of a check up determines its cure period, which is the grace period a project has to resolve a failure before its membership status changes.
- Cure period: The number of days allowed for a fix.
noneimportance: The check up must pass at all times; there is no grace period.no deadline(cure_period_in_days = -1): The check up shows as pending, marking the project as Under revision, but it will not automatically retire the project.
Note: Individual check ups can override the default cure period of their importance level (marked with a :warning: in the catalog).